The shell of metering distribution box is made of high-quality cold-rolled steel plate, and the door of the box is provided with an observation hole;
For single-phase meter box and three-phase meter box without switch, the cable directly enters and connects to the wiring bus bar, and the user of each unit directly goes from the watt hour meter. For the single-phase meter box with single-phase switch, the cable is connected to the wiring bus bar, and connects from the outlet end of the switch to the unit user, and the lead seal wire is used after the installation and commissioning;
Cable inlet and outlet from the top or bottom are available. The switch room is equipped with three-phase wiring bus bar and protective grounding bus bar, which is convenient to realize single-phase two-wire, single-phase three-wire, three-phase four-wire and three-phase five-wire power supply. The box is equipped with lead sealing screws, and the line partition can be made according to the customer's requirements to separate the switch from the meter.
| 东海县| 项城市| 舟曲县| 金门县| 龙岩市| 镇坪县| 乌什县| 临汾市| 丰顺县| 万山特区| 东莞市| 延边| 莒南县| 松江区| 右玉县| 油尖旺区| 扬中市| 元氏县| 宿迁市| 泾源县| 长葛市| 东平县| 芜湖市| 临颍县| 会东县| 喀什市| 宁明县| 从江县| 甘泉县| 从化市| 斗六市| 子长县| 龙游县| 巴里| 田阳县| 楚雄市| 周宁县| 罗田县| 乐清市| 方正县|